Guide · Run of show

Run of show vs event agenda: what’s the difference?

An event agenda is the public schedule attendees see: session titles, speakers and times. A run of show is the private production schedule the crew uses: every segment down to the minute, with owners, technical cues, changeovers and notes. One agenda item often becomes several run of show rows.

  1. Agenda: for attendees
  2. Run of show: for the crew
  3. Built from the agenda, in far more detail
See the differences

Same event, two different audiences.

The agenda answers the attendee’s question: what’s on, when and who’s speaking. It’s published, printed and shown in the event app, and it changes rarely once it’s out.

The run of show answers the crew’s question: what exactly happens, minute by minute, and what do I do. It’s private, far more detailed and changes constantly until the show is over.

You need both. Write the agenda first, then build the run of show from it, and keep them consistent: if a session moves in the run of show, check whether the published agenda needs updating too.

What is a run of show? →
One agenda item expanded into several run of show rows on a phone

The same 90 minutes, as two documents.

An agenda for 09:00 to 10:30 might have three lines: welcome, opening keynote, industry panel. The run of show for those same 90 minutes has more than ten: walk-in, welcome, keynote walk-up, keynote, Q&A, thank-you, changeover, panel introduction, panel, audience Q&A, close and the break announcement.

That ratio is normal. Every agenda item hides its walk-ups, handovers and changeovers, and those are exactly the moments a show goes wrong.

Phone comparing three agenda lines with twelve run of show segments

How they differ

Side by side, and an example of one agenda item becoming a run of show.

Keeping the agenda and run of show in step.

Once the agenda is published, it changes rarely. The run of show changes all day. Agree a rule for when a run of show change has to reach the published agenda: for example, any move of more than ten minutes to a session start, or any session cut or swapped.

Name one person who updates the agenda, the event app and the signage when the rule is triggered, so attendees aren’t left reading a schedule the crew abandoned an hour ago.

Phone showing when a run of show change should update the published agenda

Four audiences, four versions.

In practice, one event has at least four schedules. Attendees get the agenda. Speakers get a speaker sheet: their call time, slot length, entrance and the cues that affect them. The crew gets the full run of show. The client gets a summary of the running order without crew notes.

The mistake is maintaining four separate documents. Keep one run of show as the source and produce the other three from it, so a change made once reaches every version.

Phone showing the four versions of a schedule for attendees, speakers, crew and client

FAQs

Questions about agendas and runs of show.

Do I need both an agenda and a run of show?

For any event with a stage and a crew, yes. Attendees need the agenda; the people running the show need the run of show.

Which should I write first?

The agenda. It sets the sessions and speakers, and the run of show is built from it.

Can I share the run of show with speakers?

Share their part of it: call time, slot length, entrance and the cues that affect them. The full crew version has more detail than speakers need.

What’s the difference between a run of show and an itinerary?

An itinerary is a schedule for a person or group, such as travel and meetings. A run of show is the production schedule for a live show.

Is an event program the same as an agenda?

Usually, yes. “Program” and “agenda” both describe the public schedule of sessions.

Should the agenda show end times?

Yes, for sessions people might plan around, such as breaks and the last session. End times help attendees decide when to step out.

How do I publish agenda changes on the day?

Update the event app or website first, then signage, then announce from the stage if the change affects everyone.

Turn your agenda into a run of show.

Start from the template or build it live in PresenterCue.

Purpose

Who it’s for

From this guide

Who it’s for

The agenda is written for attendees and published. The run of show is written for the production team and kept private.

Agenda
Attendees, public
Run of show
Crew, private
Shared with
Speakers see their part

What it covers

  • Agenda: public schedule
  • Run of show: production plan
  • Speakers get a version of each
  • Clients often see both
Purpose

Who maintains it

From this guide

Who maintains it

The agenda is usually owned by the organiser or content team. The run of show is owned by the producer or stage manager.

Agenda
Organiser or content lead
Run of show
Producer or stage manager
Changes
Rare vs constant

What it covers

  • Agenda changes rarely after publishing
  • Run of show changes until the end
  • Keep the two consistent
  • One person signs off each
Detail

Level of detail

From this guide

Level of detail

The agenda lists sessions. The run of show breaks each session into segments: walk-ups, introductions, talks, Q&A and changeovers.

Agenda
Sessions
Run of show
Segments
Ratio
Often 1 to 5 or more

What it covers

  • Agenda: titles and speakers
  • Run of show: every segment
  • Changeovers only in the run of show
  • Breaks in both
Detail

Timing

From this guide

Timing

Agendas usually round times to the quarter or half hour. A run of show times each segment to the minute, sometimes to the second.

Agenda
Rounded times
Run of show
To the minute
Live
Run of show tracks actual times

What it covers

  • Agenda: 09:00, 09:30
  • Run of show: 09:06, 09:08
  • Buffers only in the run of show
  • Actual times logged live
Detail

Technical cues

From this guide

Technical cues

The agenda has no technical information. The run of show carries every audio, video, lighting and stage cue for each segment.

Agenda
No cues
Run of show
Every cue
Feeds
The show caller’s script

What it covers

  • Audio and mics
  • Video and graphics
  • Lighting
  • Stage moves
Example

Example

From this guide

Example

Agenda: “09:00 Opening keynote, Jane Doe.” Run of show: keynote walk-up music, host introduction, talk, Q&A, thank-you and changeover, each timed with cues.

Agenda
1 line
Run of show
6 rows
Added
Timing, cues, owners

What it covers

  • 09:05 Walk-up music
  • 09:06 Host introduction
  • 09:08 Keynote talk
  • 09:30 Q&A, then 09:37 changeover

Share this page

Send this page to someone who runs live events.