# How to create a run of show

To create a run of show, start from the event agenda and break it into segments. Give each segment a start time and duration, add who’s responsible and every audio, video and lighting cue, then rehearse against it and update the timings before you share the final version with the crew.

1. Break the agenda into segments
2. Add timing, people and cues
3. Rehearse, revise and share

## Start from the agenda, end with the crew’s plan.

The agenda tells you what happens. The run of show tells the crew how it happens, minute by minute. The work is mostly translation: turning each agenda item into the segments, changeovers and cues that make it happen on stage.

Build it in passes. First get every segment in order with a duration. Then add people. Then add the technical cues. Trying to do everything at once is how rows get missed.

Finally, rehearse against it. Real timings from rehearsals almost always differ from the plan, and the run of show you share on show day should reflect what actually happened in the room.

See also: [What is a run of show?](https://presentercue.com/guides/what-is-a-run-of-show/)

## Worked example: timing one morning.

Take a morning that starts at 09:00. Host welcome, 5 minutes. Keynote walk-up, 1. Keynote, 30. Changeover, 3. Panel, 45. Thank-you and break announcement, 1. Add them up: 85 minutes, so the coffee break starts at 10:25.

Now suppose the keynote runs 6 minutes long. Without a buffer, the break moves to 10:31 and so does everything after it. With a 5-minute buffer before the break, you lose only a minute. That’s the case for putting buffers before fixed points rather than padding every segment.

## Habits that keep a run of show trustworthy.

Use 24-hour time, so there’s never an AM/PM mix-up at 12:30. Give every segment exactly one owner, so every question has someone to answer it. Name segments with words you’d say on headset, short and distinct, because “Panel 2” is easier to call than “Future of Work Discussion”.

Keep one master version and share views of it, rather than separate copies for each department. And write down who can change the run of show once rehearsals start, because a plan that anyone can edit is a plan nobody trusts.

## Six steps to a run of show

Work through them in order. Each pass adds one layer of detail.

### 1. Gather your inputs

Agenda, venue, speakers, tech. Collect the agenda, the venue plan, the speaker list, the technical spec and any fixed times such as meals, broadcasts or curfews.

- Owner: Producer
- Time: An hour
- Output: Everything in one place
- Confirmed agenda
- Venue and room plan
- Speaker list and requirements
- Fixed times and curfews

### 2. Break it into segments

Every agenda item, in parts. Turn each agenda item into segments: walk-up, introduction, the talk, Q&A, handover. Add rows for changeovers, breaks and walk-in.

- Owner: Producer or stage manager
- Time: An hour or two
- Output: A full list of segments
- One row per segment
- Changeovers as rows
- Walk-in and walk-out
- Short, sayable names

### 3. Set durations and buffers

Make the maths work. Give each segment a duration and let start times follow. Add short buffers before fixed points so an overrun doesn’t push them back.

- Owner: Producer
- Time: An hour
- Output: A timed schedule
- Durations first
- Start times calculated
- Buffers before fixed points
- Check against the venue’s hours

### 4. Add owners and talent

Who does what. Name the owner of every segment and the talent involved, with call times for speakers so they’re backstage in time.

- Owner: Producer
- Time: Under an hour
- Output: Every row has a name
- Segment owner
- Talent and speakers
- Call times
- Introductions and handovers

### 5. Add technical cues

Audio, video, lighting, stage. Work with each department to add its cues to each segment, numbered so the show caller and operators use the same names.

- Owner: Stage manager with department heads
- Time: A few hours
- Output: A cue-complete rundown
- Audio and mic cues
- Video and graphics cues
- Lighting cues
- Stage moves and set changes
- Related: [Show calling software](https://presentercue.com/show-calling-software/)

### 6. Rehearse, lock and share

Make it match reality. Rehearse against the run of show, update timings and cues from what happened, lock a show-day version and share it with each role.

- Owner: Producer
- Time: During rehearsals
- Output: The show-day version
- Update with real timings
- Lock a show-day version
- Share a view per role
- Track changes made live
- Related: [Run of show software](https://presentercue.com/run-of-show-software/)

## FAQs

### How long does it take to create a run of show?

For a one-day event with a single stage, a first full draft usually takes a few hours once you have the agenda and speaker details. Larger, multi-room events take longer and get revised many times.

### What tool should I use?

A spreadsheet is fine for a first draft. [Run of show software](https://presentercue.com/run-of-show-software/) becomes useful when timings change and many people need the latest version. Start with our [free template](https://presentercue.com/event-rundown-template/) either way.

### Where should buffers go in a run of show?

Add a few minutes before each fixed point, such as a break, a meal or a live broadcast, rather than padding every segment. That protects the moments that can’t move.

### Who should get a copy?

Everyone working on the show, but each in the form they need: cues for operators, call times for speakers, a summary for the client.

### What if it changes on the day?

It will. Decide in advance who can make changes, and make sure changes reach the show caller and the stage timer at the same time as everyone else.

### Should speakers see the run of show?

They should see their own part: call time, slot length, entrance, introduction and any cues that affect them, not the full crew version.

### Should I use 24-hour time?

Yes. It removes AM/PM mistakes, especially around noon and for evening events that run past midnight.

### How do I handle a segment with no fixed length?

Give it your best estimate, then put a buffer before the next fixed point. Open-ended segments such as Q&A should still have a planned end time.

### In what order should I fill in the columns?

Segments first, then durations, then owners, then technical cues, then notes. Each pass is quicker when the one before it is complete.