# A conference run of show that survives day one.

Conferences have more moving parts than most events: keynotes, panels, breakouts, sponsors and room changes. Here’s how to structure the run of show, with an example main-stage day you can copy.

1. Map every room and session
2. Add changeovers and buffers
3. Run each room from its own view

## One run of show per room, one clock for the venue.

A conference run of show works best as one rundown per room, all on the same venue clock. The main stage gets the most detail, with every cue and changeover. Breakout rooms need less, but they still need start times, speakers and the moment to send people back for the next plenary.

See also: [How to plan and run a conference](https://presentercue.com/guides/how-to-run-a-conference/)

## Short lead times mean the run of show starts late.

Many conferences are planned on short timelines. In a Global DMC Partners survey of planners, 36% of meetings and conferences were organised just 4 to 6 months ahead. By the time the agenda is confirmed, there can be only weeks left for the production schedule.

Start the run of show as soon as the session list exists, even with placeholder speakers. Changeovers, room assignments and fixed times can all be planned before the speakers are confirmed, and they’re the parts most likely to be forgotten.

> 36%: of meetings and conferences are organised 4–6 months ahead (Global DMC Partners, Q4 2024 survey)

## Changeovers: the minutes nobody schedules.

A three-minute changeover looks like nothing in a rundown. A conference day can have ten of them. Resetting chairs and mics for a four-person panel, swapping a presenter’s laptop, walking delegates from the main hall to breakout rooms: each one takes real time.

Leave them out and a day of ten sessions quietly runs half an hour late by lunch. Give every changeover its own row, with a duration you’ve actually timed in rehearsal, and that half-hour turns into a plan.

## One venue clock for every room.

Multi-track conferences fall apart in small ways: Room B’s laptop clock is two minutes fast, so its session ends early and delegates wander into Room C mid-talk. Every timer in the building should run from the same time source, not from whichever device happens to be in the room.

Give every room’s run of show the same breaks and plenary starts, send the five-minute warning to every room at once, and let the control room see which rooms are running over before the corridors fill up.

## An example conference day

A main-stage day, segment by segment, with what the crew needs for each.

### Doors and walk-in

08:30 · 30 minutes. Doors open, walk-in music plays and holding slides loop while delegates find seats. The crew uses this time for final checks.

- Time: 08:30 to 09:00
- Owner: Stage manager
- Cues: Walk-in music, holding slides
- House lights full
- Walk-in playlist
- Sponsor loop on screens
- Five-minute call at 08:55

### Opening keynote

09:00 · 35 minutes. The host welcomes delegates, then introduces the opening keynote. This is the segment to rehearse most, because it sets the pace.

- Time: 09:00 to 09:35
- Owner: Producer
- Cues: Walk-up music, lectern mic, slides
- Host welcome, 5 minutes
- Keynote, 30 minutes
- Stage timer on the confidence monitor
- Wrap-up cue at 5 minutes
- Related: [Stage timer](https://presentercue.com/stage-timer/)

### Industry panel

09:35 · 45 minutes. A moderated panel with four guests. Allow a changeover before it to set chairs and mics, and keep Q&A to a fixed slot.

- Time: 09:35 to 10:20
- Owner: Panel moderator
- Cues: Chairs set, 5 handheld mics
- 3-minute changeover
- Moderated discussion, 28 minutes
- Audience Q&A, 12 minutes
- Close, 2 minutes
- Related: [How to time a panel](https://presentercue.com/guides/how-to-time-a-panel-discussion/)

### Breakouts

11:00 · 3 rooms. Three parallel sessions in rooms A, B and C. Each has its own run of show and timer, and all must finish together for lunch.

- Time: 11:00 to 12:00
- Owner: Room managers
- Cues: Room-specific
- One run of show per room
- Shared finish time
- Room timers
- Five-minute warning to all rooms
- Related: [Event control room](https://presentercue.com/event-control-room/)

### Sponsor session

14:00 · 15 minutes. A short sponsor presentation with contracted timing. Keep it on time, because the sponsor agreement usually specifies the slot.

- Time: 14:00 to 14:15
- Owner: Partnerships lead
- Cues: Sponsor video, lectern mic
- Sponsor video, 2 minutes
- Presentation, 12 minutes
- Strict stage timer
- Handover to host

### Closing and awards

16:30 · 45 minutes. The day’s final plenary: awards, the closing speech and instructions for the evening. Many cues, so the show caller works hardest here.

- Time: 16:30 to 17:15
- Owner: Producer
- Cues: Award stings, winner walk-ups, lighting
- Award sting per category
- Winner walk-up music
- Photo position on stage
- Evening instructions on screen
- Related: [Show calling software](https://presentercue.com/show-calling-software/)

## FAQs

### What is a conference run of show?

A conference run of show is the detailed production schedule for a conference, usually one rundown per room per day, listing every session, changeover and break with times, owners and technical cues.

### How far ahead should it be ready?

Have a full draft once the agenda is confirmed, usually several weeks before the event, and lock a show-day version after the final rehearsals. Expect it to keep changing until then.

### How do I handle multiple tracks?

Give each room its own run of show and keep them on the same venue clock, so breaks and plenary sessions start together. A [control room view](https://presentercue.com/event-control-room/) shows all rooms at once.

### How much buffer time should I add?

Add a few minutes before fixed points such as breaks, lunch and plenaries, and plan a changeover row whenever the stage set or microphones change.

### Who gets a copy?

Everyone working on the show, but not the same copy: the crew needs cues, speakers need call times and slot lengths, and clients usually want a summary. Role views let one run of show serve all of them.

### Is there a template?

Yes. Download the free [event rundown template](https://presentercue.com/event-rundown-template/) and use one copy per room.

### How long should a changeover be?

Time it in rehearsal. As a starting point, allow a few minutes to reset a stage for a panel, a couple of minutes for a presenter and laptop swap, and longer when delegates move between rooms.

### Should breakout sessions start at the same time?

Usually, yes. Starting and ending breakouts together lets delegates move between rooms and keeps the next plenary on time.

### Who owns a breakout room’s run of show?

A room manager or breakout show caller, who reports timing back to the producer. Each room gets its own run of show on the shared venue clock.

## Sources

1. [Global DMC Partners Q4 2024 Meetings & Events Survey (via Exhibitor)](https://exhibitoronline.com/news/article.asp?ID=24310)

## Build your conference run of show.

One rundown per room, one clock for the venue.

Open PresenterCue: https://presentercue.com/app/